25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、应在只受载期二天前,将、计受载日期、装载量、合同码、舶代理人电报通知我。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、应在只受载期二天前,将、计受载日期、装载量、合同码、舶代理人电报通知我。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应在只受载期12天前将、计受载日期、装载数量、合同码、舶代理人,以电报通知卖方。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我指正。